PT. Baramega Citra Mandiri (BCM) – Sout Kalimantan
Date : 2004
Road Length :
7.2 km including 1 km road length for the first trial of
soil
stabilization application
Road Width : 9 meters average
Work scope :
• Up grade the quality of 1 km - road at the BCM’s coal
loading
port for the first trial of Soil Stabilization application
• Up grade the quality of 6.2 km – hauling coal road from
Kodeco’s road Station km +6 to BCM’s loading ports.
• Installing road warning signs.
• Road works maintenance until present