PT Musirawas Citra Harpindo – Central of Kalimantan
Date : 2003
Road length : 3 km
Road Width : 4 meters
Work scope :
• Road works construction including designed road width,
steepness of cut banks or road fills and drainage
installation.
•Up grade quality of the road by treating the road with
soil
stabilization
• Installing road warning sign


